Advanced Gait &
Motion Analysis System

GAITMAXIMA is an advanced computer-assisted gait and movement assessment system developed to provide objective, quantitative and clinically useful insights into human locomotion and movement. Designed for modern physiotherapy, rehabilitation, sports medicine, medical education and research environments, the system brings structured movement assessment and professional reporting into a single clinical environment.

It supports assessment of gait characteristics, temporal and spatial parameters, movement patterns and range-of-motion measurements, while enabling bilateral comparison and session-based monitoring. GAITMAXIMA is designed to complement professional clinical judgement with clear, measurable movement information.

Gait Assessment Quantitative Measurement Clinical Reporting
GAITMAXIMA clinical gait assessment setup with two to three cameras
2–3 camera assessment environment Clinical setup visual

A clinical interface built around movement data.

Assessment information can be presented through a structured visual environment for movement review, measurement and reporting.

GAITMAXIMA assessment environment with clinical measurement graphs and grids

Gait parameters at a glance.

GAITMAXIMA organizes measurable gait information into practical groups for assessment and comparison.

T

Temporal Parameters

Cadence Step Time Stride Time Stance Time Swing Time Double Support
108 steps/min 0.56 s 1.11 s
S

Spatial Parameters

Walking Speed Step Length Stride Length Step Width Foot Progression
1.12 m/s 0.62 m 1.24 m
G

Gait Cycle

Initial Contact Loading Response Mid Stance Toe-Off Swing Terminal Swing
Stance / Swing • illustrative
↔

Comparative Review

Right vs Left Temporal Difference Spatial Difference Asymmetry Session Comparison
Illustrative bilateral comparison

* Sample values and graphics on this page are illustrative website data only. They are not clinical reference ranges and do not represent an actual patient record.

Gait analysis presented as a complete movement view.

Assessment can bring together gait-cycle events, temporal measurements, spatial measurements and bilateral comparison so that professionals can review movement in a structured visual environment.

Walking Speed · 1.12 m/s Cadence · 108 steps/min Stride Length · 1.24 m Stance · 60%
GAIT CYCLE →
ANGLE / POSITION
3D-style movement visualization • sample view

* Displayed values are illustrative sample data for website presentation.

Stylized anatomical movement assessment graphic

Joint movement represented clearly.

The assessment environment can present supported joint and body-segment movement with measurable angles and range-of-motion information, helping professionals document movement characteristics and compare assessments over time.

Hip 112° sample flexion
Knee 128° sample flexion
Ankle 17° sample dorsiflexion

* Sample measurements are illustrative website data only and are not clinical reference ranges or actual patient records.

Professional reports for assessment, comparison and follow-up.

GAITMAXIMA presents assessment findings in a structured report format designed for clear review, documentation and follow-up. Key measurements and comparative findings can be organized to support professional clinical communication and longitudinal assessment.

Sample gait assessment report
Gait Assessment Report
Sample range of motion report
Range of Motion Report
Sample comparative gait report
Comparative Report
Sample progress report
Progress Report

* Sample/illustrative reports shown for website demonstration only. They are not actual patient records, diagnostic reports or validated reference reports.

A focused clinical setup for movement assessment.

GAITMAXIMA is designed for professional clinical and rehabilitation environments, with a practical assessment area that supports consistent movement observation, measurement and reporting. A 2–3 camera configuration can be arranged around the walking space and workstation according to the assessment setting.

GAITMAXIMA clinical assessment environment
Clinical assessment environment
GAITMAXIMA camera and workstation view
Camera and workstation view
GAITMAXIMA gait assessment environment
Gait assessment environment
GAITMAXIMA clinician monitoring area
Clinician monitoring area
◎

Objective

Measurable movement information to complement professional observation.

▥

Quantitative

Structured gait parameters and movement measurements for review.

↔

Comparative

Bilateral and session-based comparison where supported.

▤

Reportable

Organized assessment documentation for clinical communication.

Indian innovation.
Global ambition.

GAITMAXIMA is developed and manufactured by Elite Equipments in India, with a focus on advanced movement assessment for healthcare, rehabilitation, education, sports and research.

🇮🇳   DEVELOPED & MANUFACTURED BY ELITE EQUIPMENTS

Experience GAITMAXIMA in your clinical environment.

For product information, demonstrations and institutional enquiries.

REQUEST A DEMO →